Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Agreement for the supply, erec...
Description
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Agreement for the supply, erection, installation and commisioning of the PUSPATI TRIGA Reactor.
Published:
Sg. Buloh:
Tun Ismail Atomic Research Centre,
1976.
Subjects:
Agreements
Holdings
Description
Preview
Similar Items
Staff View
Physical Description:
123p.; 29 cm.
Similar Items
Agreement for consultancy services (man month) agreement between the Government of Malaysia and Universti Sains Malaysia (USM) for determination of neutron beam parameters and dosimetric characteristics of the MINT triga reactor thermal column (as part of a feasibility study for boron neutron capture therapy (BNCT).
Published: (2003)
Agreement for consultancy services (man month) between the Government of Malaysia and Universiti Kebangsaan Malaysia (UKM) for determination of sources of pollutants (metals, heavy metals and organic) in drinking water supplied from underground water resource.
Published: (2004)
Agreement for consultancy services (man month) between the Government of Malaysia and Universiti Sains Malaysia (USM) for determination of neutron beam parameters and dosimetric characteristics of the MINT Triga Reactor thermal column (as part of a feasibility study for boron neutron capture therapy (BNCT).
Published: (2003)
Non-disclosure agreement between Institut Penyelidikan Teknologi Nuklear Malaysia (MINT) 2003.
Published: (2003)
Project agreement Government of Malaysia (MINT) and Imatera Green Process Sdn. Bhd. : Development of Aquilaria spp. (Gaharu) Plantation and Processing.
Published: (2003)
×
Loading...